skip to Main Content

Overhead gantry crane replacement

Our Geelong team recently completed this project to aid one of our clients with headroom concerns in their pump station.

Lifting Victoria removed the original single girder crane and worked closely with the customer to ensure the optimal headroom clearance to lift and lower the pumps safely and effectively at the time of service, maintenance or replacement.

Lifting Victoria custom engineered and installed a brand-new double bridge crane with a top trolley mount configuration for longitudinal travel within the building and lateral travel above the girders.

With the right equipment and after a thorough evaluation of your space and safety requirements, our experienced on-site installation team are equipped to carry out specialised lifting projects, like this one, to provide a safe and efficient work environment. Get in touch with us if your lifting or materials handling projects call for something you can’t buy ‘off the shelf’!
Get in touch.

Back To Top
×Close search
Search

Newsletter Signup

Join our mailing list to receive the latest lifting, rigging and height safety news.
SUBSCRIBE
close-link